At this 1000-bed hospital with 3 phases project we supplied a complete synchronization switch gear system for [3x 2.2MW MTU + 1x 3.125MW CAT] DG’s powering 5 ATS/By-Pass Switches (phase-1) + 7 ATS/By-Pass Switches (phase-2) using IPU/ComAp Hi Tech systems and equipment’s iS-NT-BB+iV8 / iV17 / iM-NT-BB+iV5 Controllers.
Work carried out: Project Survey, Design, Electrical engineering, Assembling of paralleling Switch gear Main board, & site commissioning in Al Riyadh.
Scope of supply
Synchronization Switchgear & Automatic Transfer ByPass Switches
Implemented
- 2007-2014